LIVE

PJM demo is live - ask about any project

AI Agents for U.S. Grid Interconnection

Track queues, cluster results, stakeholder meetings, and tariff filings.Access via our Gridsurf platform or MCP server.

Read Our Thesis

Use cases

Ask like your analyst. Run workflows like your data team.

01

Generator Developer

For IPPs triaging the 15-day cluster decision window.

Pull AG2-005's network upgrade cost breakdown from PJM TC2 Cycle 1. Show me the top 5 upgrades by $/kW, who else shares each one, and flag any partner with withdrawal risk above 60%.
02

Data Center Developer

For hyperscaler site selection teams evaluating BYOG.

We're siting a 500 MW data center in the PPL zone. Find active gas projects within 5 substations of our load, rank by COD and withdrawal risk, and tell me which ones have clean cost allocation.
03

Power Market Consultant

For analysts publishing cluster takeaways the day results drop.

Draft a LinkedIn post summarizing MISO DPP Phase 2 results: median $/kW by fuel type, zones with the highest cost swing vs. Phase 1 and three projects to watch. Cite every number.
04

M&A / Tax-Equity Investor

For deal teams pricing risk before signing term sheets.

Assess a 200 MW AEP-Ohio storage deal: map contingent upgrades, model COD slip if the two largest projects drop, and draft a source-backed deal memo.

Interconnection queue diligence is slow.
Gridsurf makes it fast.

Read Our Thesis